- Home page
- News and more
- ECO – Interview Andreas Taarning
ECO – 3 Questions to Andreas Taarning, Technical Project Manager Portables
October 24, 2023
As the technical project manager for portables, Andreas Taarning was deeply involved in the ECO project at each step. Watch the interview to learn why it was so exciting, how simulations helped create the ECO and how the team overcame challenges while working on the new portable X-ray system.
Latest Posts
Focus topic. The HP/15 builds on two decades of proven HP/11 performance for digital detectors, in-line inspection and CT.
September 10, 2026
For two decades the HP/11 has been the reference minifocus X-ray tube for high-resolution and high throughput radiography. The HP/15 keeps everything that made it trusted, and reengineers the rest for digital detectors, in-line inspection and computed tomography.
Read moreFrom the field. Cooler leakage with Pierre-Emmanuel Rigot at X-RIS
September 10, 2026
This is not primarily a story about a cooler leak - it is a story about what happens when insight arrives too late. About the cost of operating without remote access. About the difference between reacting to failures and preventing them. And about how weak signals only become meaningful over time when data is allowed to flow. At its core, this case shows why BLOX alone is not enough.
Read moreNDT Tough with Per Gunnar Johansen: Managing thousands of welds at Aker Solutions
August 13, 2026
Aker Solutions in Verdal is one of Norway’s largest fabrication yards, where enormous steel jackets rise through thousands of welds, demanding nonstop coordination between production and inspection. The scale is matched only by the people behind it, families who stay for decades, generations working side by side, and inspectors who carry the responsibility for quality across massive structures.
Read more